Disassembly video
Release time:
Mar 30,2026
Remove the bed-mounted drag chain and pack it securely.
Remove the drag chain tray on the side of the fuselage.
The fuselage connecting flange is used to join two fuselage sections. The fuselage can only be removed after the flange is dismantled.
Key components of the machine are all labeled for easy installation later on.
With the fuselage secured, begin dismantling the cable carrier housing on the side of the nose.
Remove the drag chain mounting bolts and take off the drag chain.
Remove the bolts securing the drag chain support column and then detach the column.
Demolition complete.
The oil pump is located beneath the machine body, with oil lines running above it; both the lines and the pump are marked with corresponding identification numbers to facilitate installation. This area is primarily used to supply lubricating oil to the headstock chuck.
Organize the remaining cable carriers properly.
Remove the head mounting bolts and take off the housing.
Remove the bolts connecting the nose to the fuselage.
Welded square tubing on the machine head facilitates disassembly.
Remove the machine head from the machine pit.
For machine installation, please watch in reverse order.
Contact Us
Whatsapp:+86-18354266889
Tel: +86-15020338587
Email: xu@jiankun.net
Address: East End of Yinhua Road, Pingyi County Economic Development Zone, Linyi City, Shandong Province
Copyright © Shandong Jiankun Robot Co., Ltd. (Linyi Jiankun Intelligent Technology Co., Ltd.) Powered by www.300.cn SEO